Bauhütte

The cathedral’s stonemason workshop is at the heart of the Bauhütte.

Work in the workshop in winter

Sketches for the production of finials

Sketches for the production of “square pinnacles”

Completely carved square pinnacle at the 3rd Wimperg zone of a giant pinnacle.

Two part pillar head; the finial will be placed on a pillar pinnacle, which in turn is placed on the pillar head.

Pillar pinnacle

Gable crockets for the transition from tower shaft to tower helmet.

Conclusion of a helmet gable

One of the numerous finials to be carved (without pommel)